Holly Springs Road Bridge over Coldwater River, DeSoto County, MS
The purpose of this survey was to provide survey data to the designers so that a new bridge could be constructed across the Coldwater River: Pickering’s survey tasks involved surveying valley sections for hydraulic analysis purposes; corridor survey along the proposed alignment and cross-sections for design purposes, locating property corners and preparing plats and legals for ROW acquisition and easements, and eventually construction staking.
Completion date:
ongoing
