Memphis International Airport - Inbound Road
The Inbound Road project at Memphis International Airport is the third phase and a critical revamping to the airport entrance. Pickering was tasked with the following design scope for this project:
- Horizontal and Vertical Geometry
- Subsurface Utility Engineering
- New 12-inch Sanitary Sewer
- New 10-inch Water Main
- Grading and Drainage
- Relocation of Extensive Utilities
- Roadway Lighting
- Overhead and Roadside Signage
- Pavement Markings
- Extensive Traffic Control Plans
- Erosion Control
This project also includes quantities determination and full specifications.
MSCAA
Airport Inbound Road
Memphis, TN
Construction Cost
$8 million
Completion Date
2006 (Design)